Beta
×

Welcome to the Slashdot Beta site -- learn more here. Use the link in the footer or click here to return to the Classic version of Slashdot.

Thank you!

Before you choose to head back to the Classic look of the site, we'd appreciate it if you share your thoughts on the Beta; your feedback is what drives our ongoing development.

Beta is different and we value you taking the time to try it out. Please take a look at the changes we've made in Beta and  learn more about it. Thanks for reading, and for making the site better!

$1.5 billion: The cost of cutting London-Toyko latency by 60ms

MrSeb (471333) writes | more than 2 years ago

Network 0

MrSeb writes "Starting this summer, and thanks to the continuing withdrawal of Arctic sea ice, a convoy of ice breakers and specially-adapted polar ice-rated cable laying ships will begin to lay the first ever trans-Arctic Ocean submarine fiber optic cables. Two of these cables, called Artic Fibre and Arctic Link, will cross the Northwest Passage which runs through the Canadian Arctic Archipelago. A third cable, the Russian Optical Trans-Arctic Submarine Cable System (ROTACS), will skirt the north coast of Scandinavia and Russia. All three cables will connect the United Kingdom to Japan, with a smattering of branches that will provide high-speed internet access to a handful of Arctic Circle communities. The completed cables are estimated to cost between $600 million and $1.5 billion each. As it stands, it takes roughly 230 milliseconds for a packet to go from London to Tokyo; the new cables will reduce this by 30% to 170ms. The latency drop will mainly benefit algorithmic stock market traders, but other areas like education, telemedicine, and POTS will also enjoy the speed-up. Perhaps more importantly, almost every cable that lands in Asia goes through a choke point in the Middle East or the Luzon Strait between the Philippine and South China seas. If a ship were to drag an anchor across the wrong patch of seabed, billions of people could wake up to find themselves either completely disconnected from the internet or surfing with dial-up-like speeds. The three new cables will all come down from the north of Japan, through the relatively-empty Bering Sea — and the Arctic Ocean, where each of the cables will run for more than 5,000 miles, is one of the least-trafficked parts of the world. That said, the cables will still have to be laid hundreds of meters below the surface to avoid the tails of roving icebergs."
Link to Original Source

cancel ×

0 comments

Sorry! There are no comments related to the filter you selected.

Check for New Comments
Slashdot Login

Need an Account?

Forgot your password?

Submission Text Formatting Tips

We support a small subset of HTML, namely these tags:

  • b
  • i
  • p
  • br
  • a
  • ol
  • ul
  • li
  • dl
  • dt
  • dd
  • em
  • strong
  • tt
  • blockquote
  • div
  • quote
  • ecode

"ecode" can be used for code snippets, for example:

<ecode>    while(1) { do_something(); } </ecode>